This is an automatic system that enables automatic switching of the network in the event of a power failure
Automation is translated into Czech, including error messages. It goes without saying that control in other languages in English, German, and Italian is possible. We can equip the AT207 automation with a modem and a telephone card, which can send messages about the status of the power plant to specified telephone numbers. Of course, it is also possible to start from the phone using a simple command. If the power plant is equipped with tanks with electronic fuel monitoring, the automation can not only turn off the power plant if the fuel is low, but also send a message about the lack of fuel. Other functions include the ability to disable starts when it is not needed.
Large readable color display
Descriptions in the Czech language
Remote start automatically via phone, SMS or app
Sending messages about the status of automation (start, shutdown, supply of electricity, information about the current status, etc.)
Prophylactic starts and settings for each day of the week
Prohibiting the starting of the power generator at specific hours, for example at night
In the event of a power outage, you can set how quickly the power generator should start
When supplies are restored before switching off the power generator, you can set the time when the generator can already be turned off
Sending messages about fuel status (only when fitted with a tank with electronic fuel monitoring)
Error messages in the Czech language
The possibility of starting on demand (solar panels, pressure vessels, pumps monitoring the water level, etc.)